High number of N.NsaDc.SgNB.Add.Fail.Radio.UeCapability in some cells
|
|
29
|
1626
|
September 27, 2023
|
5G NSA eNB and gNB from different vendors
|
|
24
|
1654
|
September 18, 2023
|
How to check Latency in EN-DC in the network?
|
|
21
|
125
|
September 13, 2023
|
List of all possible 5G NR Handover Scenarios
|
|
20
|
6585
|
September 11, 2023
|
Cellular key to use service mode on phone
|
|
3
|
342
|
September 11, 2023
|
What are the command line to check ENDC features and X2 link status between LTE and NR cell?
|
|
1
|
96
|
September 8, 2023
|
5G icon displayed, but no 5G coverage area
|
|
17
|
9165
|
September 6, 2023
|
3CC on the LTE + NR. Tx Ant = 8?
|
|
1
|
301
|
September 3, 2023
|
What UE shows on network bars during a call in EN-DC mode?
|
|
6
|
101
|
August 31, 2023
|
5G NSA Non Standalone - Registration Call Flow | ENDC Registration | Dual connectivity
|
|
0
|
146
|
August 30, 2023
|
Can same NR cell be used as NSA cell and SA cell simultaneously?
|
|
69
|
3115
|
August 30, 2023
|
What is the advantages in EN DC in Uplink?
|
|
1
|
84
|
August 16, 2023
|
For ENDC mode, what parameters need to be enabled on 4G side and 5G side?
|
|
10
|
1438
|
August 16, 2023
|
LTE X2 Handover failure reason cause handover-target-not-allowed
|
|
6
|
2388
|
August 4, 2023
|
Ericsson ENM CLI commands
|
|
26
|
33921
|
July 30, 2023
|
What is the Split bearer in ENDC?
|
|
0
|
551
|
July 17, 2023
|
5G NSA latching issue in one site
|
|
8
|
1273
|
July 6, 2023
|
Parameter set to check Nokia ENDC
|
|
1
|
738
|
July 3, 2023
|
Ericsson Cell Trace
|
|
14
|
1954
|
June 26, 2023
|
5G NR-NR Dual Connectivity (NR-DC/NRDC) SN (Secondary Node) Addition Procedure
|
|
0
|
2333
|
May 23, 2023
|
UE overheating for EN-DC
|
|
4
|
1473
|
June 3, 2023
|
What are the reasons for SCG FAILURE INFORMATION NR (Random Access Problem)?
|
|
23
|
8794
|
May 31, 2023
|
“5G NR Bearer Drop” with SCG failure “randomAccessProblem”
|
|
11
|
6623
|
May 31, 2023
|
How is 3-band or 4-band EN-DC working?
|
|
0
|
116
|
May 30, 2023
|
Advantage of increasing Time To Trigger
|
|
28
|
680
|
May 26, 2023
|
Why SgNB is released for VoLTE call in ENDC?
|
|
6
|
234
|
May 6, 2023
|
6G initial phase
|
|
48
|
910
|
May 5, 2023
|
Push more traffic towards less utilized band in ENDC
|
|
0
|
125
|
May 3, 2023
|
Dual Connectivity (DC) vs Carrier Aggregation (CA) In 5G-NR
|
|
0
|
2051
|
April 30, 2023
|
EN-DC Secondary Node Addition Procedure
|
|
0
|
844
|
April 28, 2023
|