Combination of sub-6 & mmWave

Non ideal BH means 2 nodes not reside in same netowrk element (eNB/gNB) AND scheduling is not on real time basis.
For example, Samsung eNB support 12 cells.
So scheduling happens on these cells on real time, doesn’t required X2 or Xn to schedule other cells.
Alternately Inter site CA require X2/Xn interface to schedule other cell.
Where there is delay in scheduling other cell.
This is non ideal BH.

Also check this: