Hello,
The IE NeedForGapsInfoNR indicates whether measurement gap is required for the UE to perform SSB based measurements on an NR target band while NR-DC or NE-DC is not configured. (TS 138 331 - V16.4.1)
My question is: Why does the gNB need this information from the UE? Is it important for the cell re-selection procedure?
Thanks