Hello dear Experts,
In cellular systems, the user equipment (UE) can request a change in the frequency band when its rate drops below a threshold on the current band. The UE is then instructed by the base station (BS) to measure the quality of candidate bands, which requires a measurement gap in the data transmission, thus lowering the data rate.
Is a measurement gap necessary in an NR base station (BS) operating on both FR-1 and FR-2 frequencies?
Can a near real-time intelligence help the BS with the radio resource management?